APPLICATION - HYDROELECTRIC POWERPLANT


1. Marimbondo power station equipped with FEROGLIDE guidevane bearings.
2. View of turbine and spherical valve while being installed in the pump storage plant "Waldeck".
3. FEROGLIDE special 400 mm ball dia, actuator bearing for spherical valve.
4. Installation of FEROGLIDE guide vane bearings in pump turbine for pump storage plant "Waldeck".
5. FEROGLIDE 1000 mm bore dia, bearing installed in 5700 mm butterfly valve for "Karakaya" power station in Turkey.

1

2

3

4

5


MOTION CONTROL TECHNOLOGY || HOME || CONTACT US